本文已被:浏览 1602次 下载 1次
投稿时间:2017-06-29 修订日期:2017-08-25
投稿时间:2017-06-29 修订日期:2017-08-25
中文摘要: 以铜冶炼黑铜泥为原料,研究氧化酸浸和氧化碱浸过程的酸/碱过量系数、反应温度、液固比、通氧气量、搅拌速度等因素对Cu、As浸出率的影响规律,并确定了最佳的工艺条件。研究结果表明,黑铜泥氧化酸浸Cu、As浸出率分别为93.15%,94.74%;氧化碱浸As浸出率为90.27%。黑铜泥氧化浸出工艺实现了Cu、As与其他有价金属的有效分离。
Abstract:Using copper as the raw material for floating anode slime, the effects of acid/alkali concentration, reaction temperature, liquid solid ratio, oxygen partial pressure and stirring rate on the leaching rate of copper and arsenic were studied, and the optimum technological conditions were determined. The results showed that the leaching rate of copper and arsenic in black copper sludge by oxidizing acid leaching was 93.15% and 94.74%. The leaching rate of copper and arsenic in black copper sludge by oxidation alkali leaching was 90.27%. The effective separation copper and arsenic from other valuable metals was realized by oxidation leaching process of black copper sludge.
文章编号: 中图分类号: 文献标志码:
基金项目:
作者 | 单位 | |
王胜* | 兰州理工大学省部共建有色金属先进加工与再利用国家重点实验室 | wangtion@163.com |
申莹莹 | 兰州理工大学省部共建有色金属先进加工与再利用国家重点实验室 | |
王玉棉 | 兰州理工大学省部共建有色金属先进加工与再利用国家重点实验室 | |
张胜全 | 兰州理工大学省部共建有色金属先进加工与再利用国家重点实验室 |
引用文本:
王胜,申莹莹,王玉棉,张胜全.黑铜泥浸出工艺及机理研究[J].有色金属工程,2018,8(3):.
王胜,申莹莹,王玉棉,张胜全.黑铜泥浸出工艺及机理研究[J].有色金属工程,2018,8(3):.